The Pre-operation Inspection of 200KW Immersion Cooling Cabinet (Part 1)

As an experienced immersion cooling manufacturing company, we have established the Box Technology brand to provide high-quality immersion cooling systems at the most cost-effective prices to miners around the world.

 

We are committed to providing the highest quality, most energy-efficient products that allow our customers to get the most out of their cryptocurrency mining process.

 

With this in mind, through the continuous efforts of our R&D team, we have developed a 200KW immersion cooling cabinet.

 

In today’s article, we will take the 200KW immersion cooling cabinet  as an example and describe our pre-operation inspection in detail below.

Step 1: Install the Waterway

After the 200KW liquid cooling box is in place, the first step is to install the waterway.

What’s more, the bottom pipe of our boxtechy DT-200KW is for water in, and the above pipe of our boxtechy DT-200KW is for water out.

the bottom pipe of our boxtechy DT-200KW is for water in and above pipe of our boxtechy DT-200KW is for water out.



Step 2: Connected to Pipes by Flexible Hose

We use flexible hoses, connected to pipes, and connect the main line to the Cooling Tower.
Connected to Pipes by Flexible Hose
Step 3: Remove the Cover Plate of the PDU

Let us brief the 200kw start-up operation:
First, remove the cover plate of the PDU.
Remove the Cover Plate of the PDU
Step 4: Put into the Miners

Then, put the miners into the 200kw immersion cooling machine.
miners into the 200kw immersion cooling machine
Step 5: Plug in the power cord

Plug in the power cord and the network cable.
up to 2 centermeters over the oil scale
Step 6: Pour the fluid in

Then pour the fluid, up to 2 centimeters over the oil scale.

In part 1 we have primarily introduced the waterway installation, pipes’ connection, and so on. More pre-operation Inspections will be continued in the next update.

 

Please contact us if you have any questions about our products.